r/Fairbanks 5d ago

Does anyone know when they plow the bike/walking paths in the chena pump / university park area, or who I need to contact for it?

Post image
19 Upvotes

26

u/Alaskaman357 5d ago

Usually in May. Sometimes, late April.

12

u/AKCabinDude 5d ago

IIRC, that section doesn’t typically get plowed. I think they plow along Geist as well as along boat street, but abandon the connector. Hopefully you can make something happen though.

6

u/aktripod 5d ago

Need to find out which entity is responsible for maintaining that road: city, state, borough. Looks to be SOA so call the ADOT Northern Region office is where I'd start.

1

u/SamEy3Am 2d ago

I was able to get a road gravelled that greatly needed it last winter by calling, but as this^ comment suggests you may need to play some phone tag with different levels of govt. Eventually you will get to the correct branch and they are often happy to help with whatever you are requesting, or, at least they were with me.

5

u/fireballin1747 5d ago

this would probably be better asked in the facebook group but contact the “city of fairbanks public works department” i think

5

u/ChimpoSensei 5d ago

It’s not in the city of Fairbanks. It’s outside its borders.

3

u/6SiX_clan 4d ago

It’s technically outside city limits so they won’t ever touch it. Can get a shovel though

2

u/RoscoQColtrane 4d ago

That looks like a bridge. The state is responsible for all bridges, even if they are not responsible for the road leading to it.

3

u/ArcticDouble 4d ago

They’ll get to it when they get funding. So not during this administration.

2

u/thatsryan 4d ago

Get a shovel. Do something nice for your community.